<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Clark County - File #: 25-0499-082025</title><link>https://clark.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=7511084&amp;GUID=99531A12-4CF5-4670-A2BA-3F7F99C9D791</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://clark.legistar.com/Feed.ashx?GUID=99531A12-4CF5-4670-A2BA-3F7F99C9D791&amp;ID=7511084&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>Clark County - File #: 25-0499-082025</title><link>https://clark.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=7511084&amp;GUID=99531A12-4CF5-4670-A2BA-3F7F99C9D791</link><guid isPermaLink="false">99531A12-4CF5-4670-A2BA-3F7F99C9D791-2025-09-17-22-01-16</guid><description>Title: UC-25-0499-COUNTY OF CLARK (ADMINISTRATIVE):
USE PERMITS for the following: 1) large-scale electric generation (solar); 2) public utility structures (electric substation, Battery Energy Storage System (BESS) facility, utility poles, and overhead transmission lines) and all ancillary structures; and 3) a communication tower.
WAIVERS OF DEVELOPMENT STANDARDS for the following: 1) increase structure height; 2) eliminate street landscaping; 3) eliminate buffering and screening; and 4) modify residential adjacency standards.
DESIGN REVIEWS for the following: 1) a large scale, solar electric generation facility; 2) public utility structures and all ancillary equipment; 3) a communication tower; and 4) final grading plans for a hillside development on a 2,866.51 acre portion of a 4,870.79 acre site in an RS80 (Residential Single-Family 80) Zone and an IP (Industrial Park) Zone. Generally located northwest of Needles Highway and north and south of Laughlin Boulevard within Laughlin.  MN/hw/cv  (For possible action)</description><pubDate>Wed, 17 Sep 2025 22:01:16 GMT</pubDate></item></channel></rss>