Legislation Details

File #: 25-0881-021726   
Status: Passed
File created: 2/4/2026 In control: Clark County Planning Commission
On agenda: 2/17/2026 Final action: 2/17/2026
Title: UC-25-0881-USA BUREAU LAND MANAGEMENT: USE PERMIT to allow public utility structures (500 kV overhead transmission lines). WAIVER OF DEVELOPMENT STANDARDS to increase the height of public utility structures. DESIGN REVIEW for proposed public utility structures (overhead transmission lines) in conjunction with an existing electrical substation on a portion of 28,224.66 acres in an OS (Open Space) Zone and an RS80 (Residential Single-Family 80) Zone. Generally located south of State Route 168 and east of US-93 within the Northeast County. MK/dd/cv (For possible action)
Attachments: 1. UC-25-0881_Color_Merged.pdf, 2. 07 25-0881-021726.pdf

UC-25-0881-USA BUREAU LAND MANAGEMENT:

 

USE PERMIT to allow public utility structures (500 kV overhead transmission lines).

WAIVER OF DEVELOPMENT STANDARDS to increase the height of public utility structures.

DESIGN REVIEW for proposed public utility structures (overhead transmission lines) in conjunction with an existing electrical substation on a portion of 28,224.66 acres in an OS (Open Space) Zone and an RS80 (Residential Single-Family 80) Zone.

 

Generally located south of State Route 168 and east of US-93 within the Northeast County.  MK/dd/cv  (For possible action)