Legislation Details

File #: 23-400168-011624   
Status: Passed
File created: 1/4/2024 In control: Clark County Planning Commission
On agenda: 1/16/2024 Final action: 1/16/2024
Title: ET-23-400168 (UC-21-0597)-TRANS-AERO LAND & DEVELOPMENT: USE PERMIT FIRST EXTENSION OF TIME to allow a service bay door for a vehicle (automobile) wash to face a street. WAIVERS OF DEVELOPMENT STANDARDS for the following: 1) reduce parking lot landscaping; and 2) eliminate the required loading space. DESIGN REVIEWS for the following: 1) vehicle wash; 2) restaurant; 3) outside dining and drinking; and 4) vehicle maintenance (smog check) in conjunction with an existing convenience store and gasoline station on 1.0 acres in a C-2 (General Commercial) Zone. Generally located on the east side of Decatur Boulevard and the north side of Desert Inn Road within Winchester. JJ/nai/syp (For possible action)
Attachments: 1. ET-23-400168_Color_Merged.pdf, 2. 04 23-400168-011624.pdf

ET-23-400168 (UC-21-0597)-TRANS-AERO LAND & DEVELOPMENT:

 

USE PERMIT FIRST EXTENSION OF TIME to allow a service bay door for a vehicle (automobile) wash to face a street.

WAIVERS OF DEVELOPMENT STANDARDS for the following: 1) reduce parking lot landscaping; and 2) eliminate the required loading space.

DESIGN REVIEWS for the following: 1) vehicle wash; 2) restaurant; 3) outside dining and drinking; and 4) vehicle maintenance (smog check) in conjunction with an existing convenience store and gasoline station on 1.0 acres in a C-2 (General Commercial) Zone.

 

Generally located on the east side of Decatur Boulevard and the north side of Desert Inn Road within Winchester.  JJ/nai/syp  (For possible action)