Title: Approve and authorize the award of Project 19101, Lincoln Lift Station Rehabilitation, to the lowest responsive and responsible bidder and authorize the General Manager to sign a contract contingent upon the submission of the required bonds and insurance. Staff recommends award to MMC, Inc., (Greg J. Paulk, President); or take other action as appropriate. (For possible action)
Attachments: 1. Staff Report, 2. 19101 Ownership Disclosure

CLARK COUNTY Water Reclamation District

Board of Trustees

AGENDA ITEM

 

Petitioner:

Thomas A. Minwegen, General Manager

Recommendation: 

title

Approve and authorize the award of Project 19101, Lincoln Lift Station Rehabilitation, to the lowest responsive and responsible bidder and authorize the General Manager to sign a contract contingent upon the submission of the required bonds and insurance. Staff recommends award to MMC, Inc., (Greg J. Paulk, President); or take other action as appropriate. (For possible action)

body

 

 

FISCAL IMPACT:

Fund #:

Capital Funds

Fund Name:

CCWRD General Funds

Fund Center:

CCWRD Funds

Funded PGM/Grant:

N/A

Amount:

$47,658,757

Description:

Lincoln Lift Station Rehabilitation

Additional Comments:

N/A

 

BACKGROUND: 

The Lincoln Lift Station has been in service since 1981. A condition assessment in 2006 indicated that it was nearing the end of its useful service life.  Since then, staff have performed frequent maintenance to ensure its continued operation until a larger capital project could be completed.  In recent years, the station has experienced numerous pump failures and service outages, largely due to an increase in disposable wipes entering the sewer system.  Additionally, the existing wet well no longer provides adequate storage capacity for the sewer basin it serves, often necessitating the use of portable bypass pumps to address these issues. Project No. 19101, Lincoln Lift Station Rehabilitation, will demolish the existing Lincoln Lift Station, and construct a new Lincoln Lift Station along with a redundant lift station to service the growth within the northeast portion of unincorporated Clark County. The project will install wet wells, a dry well, odor control, a new generator, valve vaults, force mains, potable water service, flow metering, rock catchers, and chopper pumps.

A request for bids was published on May 7, 2024, in the Las Vegas Review Journal, advertised on the Nevada Government Marketplace (NGEM), and posted on the District’s website. Bids were received and publicly opened on August 1, 2024, at 2:00 PM. Four (4) bids were received:

BIDS RECEIVED
                                                                               BID AMOUNT
MMC, Inc
                                                                                            $47,658,757
Sletten Construction of Nevada, Inc.
                                                     $50,294,000
J.A. Tiberti Construction Co., Inc.
                                                     $51,477,809
Harber Company, Inc. dba Mountain Cascade of Nevada
                           $58,839,700

In accordance with NRS 338.1385(5), if the governing body or its authorized representative has advertised for or requested bids in letting a contract, the governing body or its authorized representative must award the contract to the lowest responsive and responsible bidder.

Staff recommends that the Board approve the selection of and authorize the General Manager to sign a contract with MMC, Inc., as the lowest responsive and responsible bidder. MMC, Inc. holds a Clark County business license