Legislation Details

File #: 24-0757-021925   
Status: Agenda Ready
File created: 2/6/2025 In control: Clark County Zoning Commission
On agenda: 2/19/2025 Final action:
Title: UC-24-0757-USA: USE PERMITS for the following: 1) a large scale, electric generation facility (solar); and 2) public utility structures (electric substation, overhead transmission lines, and BESS facility) and associated equipment. WAIVERS OF DEVELOPMENT STANDARDS for the following: 1) increase structure height; and 2) reduce security fence height. DESIGN REVIEW for a large scale, solar electric generation facility and public utility structures and associated equipment on a portion of 2,705.54 acres in an RS80 (Residential Single-Family 80) Zone. Generally located on the southwest side of State Route 160 and the northwest side of Tecopa Springs Road within the Northwest County Planning area. JJ/hw/kh (For possible action)
Attachments: 1. UC-24-0757_Color_Merged.pdf, 2. 13 24-0757-021925.pdf

UC-24-0757-USA:

 

USE PERMITS for the following: 1) a large scale, electric generation facility (solar); and 2) public utility structures (electric substation, overhead transmission lines, and BESS facility) and associated equipment.
WAIVERS OF DEVELOPMENT STANDARDS for the following: 1) increase structure height; and 2) reduce security fence height.
DESIGN REVIEW for a large scale, solar electric generation facility and public utility structures and associated equipment on a portion of 2,705.54 acres in an RS80 (Residential Single-Family 80) Zone.

 

Generally located on the southwest side of State Route 160 and the northwest side of Tecopa Springs Road within the Northwest County Planning area.  JJ/hw/kh  (For possible action)