File #: 23-0424-092023   
Status: Agenda Ready
File created: 9/7/2023 In control: Clark County Zoning Commission
On agenda: 9/20/2023 Final action:
Title: UC-23-0424-USA: HOLDOVER USE PERMITS for the following: 1) electric generating station (solar photovoltaic facility); 2) electric substation; 3) overhead power transmission line; 4) increase the height of utility structures; 5) public utility structures with all accessory structures; 6) waive landscaping and screening requirements; 7) eliminate trash enclosure; 8) waive noise standards; and 9) allow signage in conjunction with the electric generating station and electrical substation. WAIVER OF DEVELOPMENT STANDARDS for off-site improvements (curb, gutter, sidewalk, streetlights, and paving). DESIGN REVIEWS for the following: 1) electric generating station (solar photovoltaic facility) 2) electrical substation; 3) overhead power transmission line; 4) maintenance and operations building; 5) public utility structures with all accessory/ancillary structures and uses; 6) final grading for a hillside development (slopes greater than 12%); and 7) finished grade on a 4,457 acre portion of a 9,487.7 acre site in an R-U (Rural Open Land) Zone. Generally located 2,800 feet southwest of SR 160 and the north side of Tecopa Springs Road (alignment) within the Northwest County Planning Area. JJ/md/syp (For possible action)
Attachments: 1. UC-23-0424_Color_Merged.pdf, 2. 07 23-0424-092023.pdf
Date Action ByActionResultAction DetailsMeeting DetailsVideo/Audio
No records to display.

UC-23-0424-USA:

 

HOLDOVER USE PERMITS for the following: 1) electric generating station (solar photovoltaic facility); 2) electric substation; 3) overhead power transmission line; 4) increase the height of utility structures; 5) public utility structures with all accessory structures; 6) waive landscaping and screening requirements; 7) eliminate trash enclosure; 8) waive noise standards; and 9) allow signage in conjunction with the electric generating station and electrical substation.
WAIVER OF DEVELOPMENT STANDARDS for off-site improvements (curb, gutter, sidewalk, streetlights, and paving).

DESIGN REVIEWS for the following: 1) electric generating station (solar photovoltaic facility) 2) electrical substation; 3) overhead power transmission line; 4) maintenance and operations building; 5) public utility structures with all accessory/ancillary structures and uses; 6) final grading for a hillside development (slopes greater than 12%); and 7) finished grade on a 4,457 acre portion of a 9,487.7 acre site in an R-U (Rural Open Land) Zone.

 

Generally located 2,800 feet southwest of SR 160 and the north side of Tecopa Springs Road (alignment) within the Northwest County Planning Area.  JJ/md/syp  (For possible action)