Legislation Details

File #: 23-0434-081623   
Status: Agenda Ready
File created: 8/3/2023 In control: Clark County Zoning Commission
On agenda: 8/16/2023 Final action:
Title: UC-23-0434-NEVADA POWER COMPANY: USE PERMITS for the following: 1) eliminate landscaping; 2) eliminate trash enclosure; and 3) noise limitations. DESIGN REVIEWS for the following: 1) new electric generation components, equipment, and structures; 2) site expansion for an existing electric generating station; and 3) finished grade in conjunction with an existing electric generating station on 85.0 acres in an M-2 (Industrial) Zone. Generally located on the west side of Apex Power Way, 4,800 feet southwest of the US Highway 93 N within the Northeast County Planning Area. MK/jor/syp (For possible action)
Attachments: 1. UC-23-0434_Color_Merged.pdf, 2. 11 23-0434-081623.pdf
Date Action ByActionResultAction DetailsMeeting DetailsVideo/Audio
No records to display.

UC-23-0434-NEVADA POWER COMPANY:

 

USE PERMITS for the following: 1) eliminate landscaping; 2) eliminate trash enclosure; and 3) noise limitations.
DESIGN REVIEWS for the following: 1) new electric generation components, equipment, and structures; 2) site expansion for an existing electric generating station; and 3) finished grade in conjunction with an existing electric generating station on 85.0 acres in an M-2 (Industrial) Zone. 

 

Generally located on the west side of Apex Power Way, 4,800 feet southwest of the US Highway 93 N within the Northeast County Planning Area.  MK/jor/syp  (For possible action)