|
Title:
|
UC-23-0434-NEVADA POWER COMPANY:
USE PERMITS for the following: 1) eliminate landscaping; 2) eliminate trash enclosure; and 3) noise limitations.
DESIGN REVIEWS for the following: 1) new electric generation components, equipment, and structures; 2) site expansion for an existing electric generating station; and 3) finished grade in conjunction with an existing electric generating station on 85.0 acres in an M-2 (Industrial) Zone. Generally located on the west side of Apex Power Way, 4,800 feet southwest of the US Highway 93 N within the Northeast County Planning Area. MK/jor/syp (For possible action)
|