Title:
|
UC-25-0480-USA:
USE PERMITS for the following: 1) large-scale electric generation (solar) facility; 2) public utility structures (Battery Energy Storage Systems (BESS), substation, utility poles, and aboveground utility lines) and all ancillary structures; and 3) a communication tower and all associated equipment.
WAIVERS OF DEVELOPMENT STANDARDS for the following: 1) increase structure height; 2) reduce security fence height; 3) eliminate buffering and screening; and 4) waive full off-site improvements.
DESIGN REVIEWS for the following: 1) a communication tower; and 2) a BESS enclosure facility, public utility structures, and associated equipment in conjunction with a proposed solar electric generation facility on a 168.8 acre portion of a 5,049.29 acre site in an RS80 (Residential Single-Family 80) Zone. Generally located southwest of State Highway 160 and northwest of Tecopa Springs Road within the Northwest County Planning area. JJ/hw/kh (For possible action)
|