File #: 24-1406   
Status: Passed
File created: 10/7/2024 In control: Clark County Board of Commissioners
On agenda: 11/5/2024 Final action: 11/5/2024
Title: Approve the award of Bid No. 607070-24, for Roadway Improvements for Spencer Street, Russell Road to Twain Avenue to the low responsive and responsible bidder, contingent upon submission of the required bonds and insurance. Staff recommends award to Holcim - SWR, Inc.; or take other action as appropriate. (For possible action)
Attachments: 1. Staff Report, 2. B607070-24 Disclosure

CLARK COUNTY BOARD OF COMMISSIONERS

AGENDA ITEM

 

Petitioner:

Jessica Colvin, Chief Financial Officer Denis Cederburg, Director of Public Works

Recommendation: 

title

Approve the award of Bid No. 607070-24, for Roadway Improvements for Spencer Street, Russell Road to Twain Avenue to the low responsive and responsible bidder, contingent upon submission of the required bonds and insurance. Staff recommends award to Holcim - SWR, Inc.; or take other action as appropriate. (For possible action)

body

 

 

FISCAL IMPACT:

Fund #:

4990.991

Fund Name:

Regional Transportation Improvements - RTC

Fund Center:

1260110001

Funded PGM/Grant:

PW.R244BFT

Amount:

$14,700,543.80

Description:

Spencer Street, Russell Road to Twain Avenue

Additional Comments:

None

 

BACKGROUND: 

Bid No. 607070-24, for Spencer Street, Russell Road to Twain Avenue was advertised on June 19, 2024, and opened on September 10, 2024.  The Bid amounts are as follows:

BIDS RECEIVED:   
                                                                                                                                                   BID AMOUNTS:

Holcim - SWR, Inc. (NBE)
                                                                                                                              $14,700,543.80
Las Vegas Paving Corporation (NBE)
                                                                                                         $14,850,000.00
TAB Contractors, Inc. (NBE)
                                                                                                                              $15,693,677.00
                     
This Contract is for mill and overlay with UTACS as well as removing and replacing plantmix bituminous surface in various locations, bringing sidewalk ramps up to ADA standards, removing and replacing sidewalks, curb, gutter, spandrels/cross gutters, medians, light fixtures, traffic control devices and pavement markings. In addition, this contract includes traffic signal modifications, installation ITS infrastructure including conduit and pull boxes, electrical conduit bank, waterline relocations, conduit relocation, utility appurtenances and other related items of work within the unincorporated area of Clark County, Nevada

The following are the pertinent provisions of the Contract:
                     The Contractor shall complete the entire work within 360 calendar days from the date specified in the                      Notice to Proceed.
                     Includes the standard termination for cause within 7 business days and termination for convenience                      language as in all public works efforts of this type.

The recommendation of award is in accordance with NRS 338.1385.5, a public body or its authorized representative shall award a contract to the lowest responsive and responsible bidder.

Holcim - SWR, Inc. currently holds a Clark County Business License.