Title: Approve the award of Bid No. 606771-23, for Jim McGaughey Detention Basin and Outfall Project to the low responsive and responsible bidder, contingent upon submission of the required bonds and insurance. Staff recommends award to TAB Contractors, Inc.; or take other action as appropriate. (For possible action)
Attachments: 1. Staff Report

CLARK COUNTY BOARD OF COMMISSIONERS

AGENDA ITEM

 

Petitioner:

Jessica Colvin, Chief Financial Officer Denis Cederburg, Director of Public Works

Recommendation: 

title

Approve the award of Bid No. 606771-23, for Jim McGaughey Detention Basin and Outfall Project to the low responsive and responsible bidder, contingent upon submission of the required bonds and insurance. Staff recommends award to TAB Contractors, Inc.; or take other action as appropriate. (For possible action)

body

 

 

FISCAL IMPACT:

Fund #:

4990.992

Fund Name:

RFCD

Fund Center:

1260110001

Funded PGM/Grant:

PW.FCLA36B$21,331,043

Amount:

$21,331,043

Description:

Jim McGaughey Detention Basin and Outfall Project

Additional Comments:

None

 

BACKGROUND: 

Bid No. 606771-23, for Jim McGaughey Detention Basin and Outfall Project was advertised on November 15, 2023 and opened on January 31, 2024.  The Bid amounts are as follows:

BIDS RECEIVED:   
                                                                                                                                                   BID AMOUNTS:
TAB Contractors, Inc. (NBE)
                                                                                                                              $21,331,043.00
Target Construction, Inc. (NBE)
                                                                                                                              $21,650,447.80
William Charles, Inc. (NBE)
                                                                                                                              $21,849,962.95
Las Vegas Paving Corporation (NBE)
                                                                                                         $23,000,000.00
                     
This Contract is for the construction of flood control facilities including a 71 acre-foot detention basin, storm drain to collect flows along Los Feliz Street between Owens Avenue and Washington Avenue discharging to the detention basin, and an outfall storm drain from the detention basin to the existing concrete channel southwest of Hollywood Boulevard and Monroe Avenue. Drainage improvements consist of a detention basin, reinforced concrete emergency spillway, boxes, pipes, drop inlets, manholes, outlet structure and energy dissipators. Other improvements include repaving of asphaltic concrete pavement and UTACS, sidewalk, curb & gutter, fencing, landscape restoration, removal and replacement of trees, signage, striping, maintenance roads, rough grading of Los Feliz Street, monitoring station and other related items of work within the unincorporated area of Clark County, Nevada.

The following are the pertinent provisions of the Contract:
                     The Contractor shall complete the entire work within 470 calendar days from the date specified in the                      Notice to Proceed.
                     Includes the standard termination for cause within 7 business days and termination for convenience                      language as in all public works efforts of this type.

The recommendation of award is in accordance with NRS 338.1385.5, a public body or its authorized representative shall award a contract to the lowest responsive and responsible bidder.

TAB Contractors, Inc. currently holds a Clark County Business License.