CLARK COUNTY BOARD OF COMMISSIONERS
AGENDA ITEM
|
Petitioner: |
Jessica Colvin, Chief Financial Officer Denis Cederburg, Director of Public Works |
Recommendation:
title
Approve the award of Bid No. 607991-26, for Las Vegas Boulevard Flamingo Pedestrian Bridge Elevator Rehabilitation and Escalator Replacement to the low responsive and responsible bidder, contingent upon submission of the required bonds and insurance. Staff recommends award to Las Vegas Paving Corporation; or take other action as appropriate. (For possible action)
body
FISCAL IMPACT:
|
Fund #: |
4180.001 |
Fund Name: |
MTP Strip Resort Corridor |
|
Fund Center: |
1260110001 |
Funded PGM/Grant: |
PW.S200609 |
|
Amount: |
$22,400,000 |
|
Description: |
Las Vegas Boulevard Flamingo Pedestrian Bridge Elevator Rehabilitation and Escalator Replacement |
|
Additional Comments: |
None |
BACKGROUND:
Bid No. 607991-26, for Las Vegas Boulevard Flamingo Pedestrian Bridge Elevator Rehabilitation and Escalator Replacement was advertised on July 23, 2026, and opened on October 5, 2026. The Bid amounts are as follows:
BIDS RECEIVED: BID AMOUNTS:
Las Vegas Paving Corporation (NBE) $22,400,000.00
Cobblestone Construction (NBE) $23,194,401.02
MMC, Inc. (NBE) $24,997,942.00
Burke Construction Group (NBE) $25,917,480.95
This Contract is for the refurbishing and repair of the four existing pedestrian bridges at the Las Vegas Boulevard and Flamingo Road intersection, including the following work:
-Replacing the twelve (12) existing escalators with new high-efficiency, heavy-duty transit-grade escalators and associated structural, mechanical, and electrical components, including extending the existing reinforced concrete escalator pits.
-Repairing and modernizing six (6) existing hydraulic elevators, including replacement of hydraulic jacks.
-Replacing and fixing elevator roofing.
-Upgrading mechanical, electrical, and maintenance rooms with new HVAC equipment, lighting, plumbing fixtures, new cold formed metal framed roof, roofing repairs and waterproofing underneath escalators and stairs.
-Existing mechanical and electrical room sizes will be enlarged. New doors and door hardware will be installed.
-Modifying existing stairs with new LED lighted handrails, tactile warning panels, and concrete stair repairs.
-Installing sand-oil separators, manholes, new sump pumps, sump pump piping, including pavement and sidewalk patching.
-Removing and restoring landscaping and irrigation.
-Installing trench drains in front of elevators.
-Removing and replacing curb & gutter and sidewalk.
The following are the pertinent provisions of the Contract:
• The Contractor shall complete the entire work within 400 calendar days from the date specified in the Notice to Proceed.
• Includes the standard termination for cause within 7 business days and termination for convenience language as in all public works efforts of this type.
The recommendation of award is in accordance with NRS 338.1385.5, a public body or its authorized representative shall award a contract to the lowest responsive and responsible bidder.
Las Vegas Paving Corporation currently holds a Clark County Business License.