Title:
|
Approve the award of Project 3053 ARACC Power and Meter Boards for EV Chargers (Project) and authorize the Director of Aviation to sign the contract contingent upon the contractor providing both a labor and material bond and a performance bond as required by the contract documents; staff recommends award to Monument Construction (Jon Wayne Nielsen, President), the lowest responsive and responsible bidder; or take other action as appropriate. (For possible action)
|