Title:
|
UC-25-0272-USA:
USE PERMIT to allow public utility structures (electrical substation and 500 kV overhead transmission lines) and associated equipment.
WAIVER OF DEVELOPMENT STANDARDS to increase the height of public utility structures.
DESIGN REVIEW for an expansion of public utility structures with all ancillary and accessory structures in conjunction with an existing electrical substation on a portion of 3,201.55 acres in an OS (Open Space) Zone. Generally located on the northwest side of I-15, approximately 6,580 feet northwest of Las Vegas Boulevard North within the Northeast County Planning Area. MK/jud/kh (For possible action)
|