File #: 21-1654   
Status: Agenda Ready
File created: 11/4/2021 In control: Clark County Board of Commissioners
On agenda: 12/7/2021 Final action:
Title: Approve the award of Bid No. 605857-21, for Streetlight LED Phase 2 to the low responsive and responsible bidder, contingent upon submission of the required bonds and insurance. Staff recommends award to L.L.O. Inc., dba Acme Electric; and acceptance of withdrawal of Bid received from Sturgeon Electric; or take other action as appropriate. (For possible action)
Attachments: 1. Staff Report, 2. B605857-21 Disclosure

CLARK COUNTY BOARD OF COMMISSIONERS

AGENDA ITEM

 

Petitioner:

Les Lee Shell, Deputy County Manager Denis Cederburg, Director of Public Works

Recommendation: 

title

Approve the award of Bid No. 605857-21, for Streetlight LED Phase 2 to the low responsive and responsible bidder, contingent upon submission of the required bonds and insurance. Staff recommends award to L.L.O. Inc., dba Acme Electric; and acceptance of withdrawal of Bid received from Sturgeon Electric; or take other action as appropriate. (For possible action)

body

 

 

FISCAL IMPACT:

Fund #:

4370.000

Fund Name:

County Capital Projects

Fund Center:

1260110001

Funded PGM/Grant:

PW.Streetlight_LED

Amount:

$3,427,775

Description:

Streetlight Phase 2

Additional Comments:

None

 

BACKGROUND: 

Bid No. 605857-21, for Streetlight LED Phase 2 was advertised on August 5, 2021 and opened on October 7, 2021. The Bid Amounts are as follows:

BIDS RECEIVED:     
                                                                                                         BID AMOUNTS
Sturgeon Electric (NBE)
                                                                                    $2,406,645.64*
L.L.O. Inc., dba Acme Electric (NBE)
                                                               $3,427,775.00
Mc4 Construction (WBE)
                                                                                    $3,897,677.00
                     
*Sturgeon Electric requested the opportunity to withdraw in lieu of being formally rejected because of a calculation error.

This Contract is for the upgrading of existing HPS (High Pressure Sodium) luminaires to LED (Liquid Emitting Diode) luminaires in both the southeast and southwest parts of town. Starting at the south side of Charleston Avenue all the way to Pine Avenue completing the southeast section of the valley and portions of the southwest starting at Hualapai Way to Las Vegas Boulevard. Upgrades also include high mast lights from 215-N from Tenaya Way to Avery Road. The improvements will consist of the replacement of existing HPS streetlights with LED on 80' and 100' right of ways and high mast upgrades.

The following are the pertinent provisions of the Contract:
                     The Contractor shall complete the entire work within 90 calendar days from the date specified in the                      Notice to Proceed.
                     Includes the standard termination for cause within 7 business days and termination for convenience                      language as in all public works efforts of this type.

The recommendation of award is in accordance with NRS 338.1385.5, a public body or its authorized representative shall award a contract to the lowest responsive and responsible bidder.

L.L.O. Inc., dba Acme Electric currently holds a Clark County Business License.