File #: 22-0459-011823   
Status: Agenda Ready
File created: 1/5/2023 In control: Clark County Zoning Commission
On agenda: 1/18/2023 Final action:
Title: UC-22-0459-1984 DEVELOPMENT LLC: HOLDOVER USE PERMITS for the following: 1) a 230kV electric substation; 2) 230kV transmission lines; 3) increase the height of utility structures; and 4) waive trash enclosure. WAIVERS OF DEVELOPMENT STANDARDS for the following: 1) waive off-site improvements (curb, gutter, sidewalk, streetlights, and partial paving); and 2) allow modified driveway design standards. DESIGN REVIEWS for the following: 1) a proposed 230kV substation with associated equipment; 2) proposed utility structures (200kV to 230kV transmission lines); and 3) finished grade on 9.0 acres in an M-D (Designed Manufacturing) Zone. Generally located on the south side of Maule Avenue and the west side of Redwood Street within Enterprise. MN/rk/syp (For possible action)
Attachments: 1. UC-22-0459_Color_Merged.pdf, 2. 25 22-0459-011823.docx

UC-22-0459-1984 DEVELOPMENT LLC:

 

HOLDOVER USE PERMITS for the following: 1) a 230kV electric substation; 2) 230kV transmission lines; 3) increase the height of utility structures; and 4) waive trash enclosure.

WAIVERS OF DEVELOPMENT STANDARDS for the following: 1) waive off-site improvements (curb, gutter, sidewalk, streetlights, and partial paving); and 2) allow modified driveway design standards.

DESIGN REVIEWS for the following: 1) a proposed 230kV substation with associated equipment; 2) proposed utility structures (200kV to 230kV transmission lines); and 3) finished grade on 9.0 acres in an M-D (Designed Manufacturing) Zone.

 

Generally located on the south side of Maule Avenue and the west side of Redwood Street within Enterprise.  MN/rk/syp  (For possible action)