Title:
|
UC-22-0459-1984 DEVELOPMENT LLC:
HOLDOVER USE PERMITS for the following: 1) a 230kV electric substation; 2) 230kV transmission lines; 3) increase the height of utility structures; and 4) waive trash enclosure.
WAIVERS OF DEVELOPMENT STANDARDS for the following: 1) waive off-site improvements (curb, gutter, sidewalk, streetlights, and partial paving); and 2) allow modified driveway design standards.
DESIGN REVIEWS for the following: 1) a proposed 230kV substation with associated equipment; 2) proposed utility structures (200kV to 230kV transmission lines); and 3) finished grade on 9.0 acres in an M-D (Designed Manufacturing) Zone. Generally located on the south side of Maule Avenue and the west side of Redwood Street within Enterprise. MN/rk/syp (For possible action)
|