File #: 21-400104-081821   
Status: Agenda Ready
File created: 8/5/2021 In control: Clark County Zoning Commission
On agenda: 8/18/2021 Final action:
Title: ET-21-400104 (UC-19-0403)-USA: USE PERMITS FIRST EXTENSION OF TIME for the following: 1) a project of regional significance; 2) a 690 megawatt alternating current electric generating station (solar photovoltaic facility) and all ancillary structures; 3) increase the height of utility structures; 4) up to three 230kV substations; 5) up to three 230kV to 500kV transmission line corridors; 6) waive landscaping and buffering; 7) waive trash enclosure; 8) waive on-site paving requirements; and 9) allow signage in conjunction with the proposed electric generating station. DESIGN REVIEWS for the following: 1) electric generating station (solar photovoltaic facility) with all ancillary structures and uses; 2) public utility structures; 3) up to three 230kV substations; and 4) office and maintenance buildings and all ancillary structures and facilities on 9,411 acres in an R-U (Rural Open Land) Zone and an O-S (Open Space) Zone. Generally located on the north and south sides of I-15 and the east and west sides of Valley of Fire BLM Road within the Northeast County Planning Area. MK/jgh/jo (For possible action)
Attachments: 1. ET-21-400104_Color_Merged.pdf, 2. 13 21-400104-081821.pdf
Date Action ByActionResultAction DetailsMeeting DetailsVideo/Audio
8/18/2021 Clark County Zoning Commission Approved

Agenda note: SUBJECT MATTER: In the matter of the aforementioned described application of USA (Thomas Regenhardt) for use permits first extension of time and design reviews (as indicated on the ATTACHED agenda item):

REPRESENTATIVE(S): Present

DISCUSSION: Following introduction of the item, the Board was addressed by Linda Bullen, the applicant’s representative, who advised of requesting the extension of time due to being in the process of finalizing permitting with the Bureau of Land Management (BLM).

Commissioner Kirkpatrick advised that no additional extensions of time will be approved and an administrative review will be held in six months.
Pass Action details Meeting details Video/Audio Video/Audio

ET-21-400104 (UC-19-0403)-USA:

 

USE PERMITS FIRST EXTENSION OF TIME for the following: 1) a project of regional significance; 2) a 690 megawatt alternating current electric generating station (solar photovoltaic facility) and all ancillary structures; 3) increase the height of utility structures; 4) up to three 230kV substations; 5) up to three 230kV to 500kV transmission line corridors; 6) waive landscaping and buffering; 7) waive trash enclosure; 8) waive on-site paving requirements; and 9) allow signage in conjunction with the proposed electric generating station.

DESIGN REVIEWS for the following: 1) electric generating station (solar photovoltaic facility) with all ancillary structures and uses; 2) public utility structures; 3) up to three 230kV substations; and 4) office and maintenance buildings and all ancillary structures and facilities on 9,411 acres in an R-U (Rural Open Land) Zone and an O-S (Open Space) Zone.

 

Generally located on the north and south sides of I-15 and the east and west sides of Valley of Fire BLM Road within the Northeast County Planning Area.  MK/jgh/jo  (For possible action)