File #: 21-575   
Status: Agenda Ready
File created: 4/14/2021 In control: Clark County Board of Commissioners
On agenda: 5/4/2021 Final action:
Title: Approve the award of Bid No. 605758-20, for The Laughlin - Bullhead City Bridge Needles Highway in Laughlin to S.R. 95, Bullhead City, Arizona to the low responsive and responsible bidder, contingent upon submission of the required bonds and insurance. Staff recommends award to Fisher Sand and Gravel Co.; or take other action as appropriate. (For possible action)
Attachments: 1. Staff Report, 2. B605758-20 Disclosure

CLARK COUNTY BOARD OF COMMISSIONERS

AGENDA ITEM

 

Petitioner:

Les Lee Shell, Chief Administrative Officer Denis Cederburg Director of Public Works

Recommendation: 

title

Approve the award of Bid No. 605758-20, for The Laughlin - Bullhead City Bridge Needles Highway in Laughlin to S.R. 95, Bullhead City, Arizona to the low responsive and responsible bidder, contingent upon submission of the required bonds and insurance. Staff recommends award to Fisher Sand and Gravel Co.; or take other action as appropriate. (For possible action)

body

 

 

FISCAL IMPACT:

Fund #:

4121.002/4990.991

Fund Name:

MTP Countywide Grants/Public Works Regional Improvements/RTC

Fund Center:

1260110001

Funded PGM/Grant:

PW.B840221/PW.R064AFT

Amount:

$52,425,000

Description:

The Laughlin - Bullhead City Bridge Needles Highway in Laughlin to S.R. 95, Bullhead City, Arizona

Additional Comments:

None

 

BACKGROUND: 

Bid No. 605758-20, for The Laughlin - Bullhead City Bridge Needles Highway in Laughlin to S.R. 95, Bullhead City, Arizona  was advertised on January 11, 2021 and opened on March 9, 2021.  The Bid Amounts are as follows:

BIDS RECEIVED:   
                                                                                                                              BID AMOUNTS:
Fisher Sand and Gravel Co. (NBE)
                                                                                    $52,425,000.00
Ames Construction, Inc. (NBE)
                                                                                                         $54,348,973.88
Las Vegas Paving Corporation (NBE)
                                                                                    $69,800,000.00
                     
This Contract is for Construction of a five-span 724 foot long prestressed concrete girder bridge over the Colorado River between Laughlin, Nevada and Bullhead City, Arizona, a 3.5 mile two-lane approach roadway in Nevada from the Needles Highway to the Colorado River Bridge, a 0.2 mile approach roadway in Arizona from the western terminus of the Bullhead Parkway, west of SR 95, to the Colorado River Bridge.

Improvements generally consist of the bridge structure, MSE retaining walls, barrier rails, guard rail, multi-use path, maintenance roads, plantmix bituminous paving, curb and gutter, drainage channels, reinforced concrete box culverts, storm drains, drop inlets, pavement markings, signing, lighting of the bridge and Arizona approach roadway, landscaping and aesthetic treatments, fencing, construction traffic control and other related items of work. 

The work includes the construction, maintenance and operation of a temporary work bridge to be used as a work platform for the construction of the permanent bridge structure, and the removal of the temporary work bridge upon completion of the permanent bridge structure.

The work also includes the construction of a pond, a noise berm, a maintenance road, a fence and drainage improvements within the adjacent Colorado River Nature Center in Arizona, south of the Bullhead Parkway. Material excavated for the construction of the pond, shall be used as fill for the construction of the Arizona approach roadway.

A borrow site is available for this project as a source of borrow embankment for the Nevada approach roadway. The borrow site is a dredged material stockpile located on a 10.8 acre parcel of land owned by Clark County in the southwest quadrant of the intersection of the Needles Highway and Marina Lagoon Drive. The borrow site is accessible from an unimproved driveway directly from the Needles Highway and is located between Marina Lagoon Drive and an un-named wash. The borrow site contains an estimated 234,000 cubic yards of material.

The following are the pertinent provisions of the Contract:
                     The Contractor shall complete the entire work within 730 calendar days from the date specified in the                      Notice to Proceed.
                     Includes the standard termination for cause within 7 business days and termination for convenience                      language as in all public works efforts of this type.

The recommendation of award is in accordance with NRS 338.1385.5, a public body or its authorized representative shall award a contract to the lowest responsive and responsible bidder.

Fisher Sand and Gravel currently holds a Clark County Business License.