File #: 23-0401-092023   
Status: Agenda Ready
File created: 9/7/2023 In control: Clark County Zoning Commission
On agenda: 9/20/2023 Final action:
Title: UC-23-0401-USA: HOLDOVER USE PERMITS for the following: 1) electric generating station (solar photovoltaic facility); 2) electrical substation; 3) generation intertie transmission line; 4) allow public utility structures with all accessory/ancillary structures; 5) eliminate landscaping and screening requirements; 6) eliminate trash enclosure; 7) increase the height of utility structures; 8) noise limits; and 9) allow signage. DESIGN REVIEWS for the following: 1) electric generating station (solar photovoltaic facility); 2) electrical substation; 3) generation intertie transmission line; 4) public utility structures with all accessory/ancillary structures; 5) maintenance building and all ancillary structures and facilities; and 6) finished grade in conjunction with a proposed electric generation station, substation, and intertie transmission line on 2,400 acres in an R-U (Rural Open Land) Zone. Generally located on the south side of SR 160 and south of Trout Canyon Road within the Northwest County Planning Area. JJ/jor/syp (For possible action)
Attachments: 1. UC-23-0401_Color_Merged.pdf, 2. 06 23-0401-092023.pdf
Date Action ByActionResultAction DetailsMeeting DetailsVideo/Audio
No records to display.

UC-23-0401-USA:

 

HOLDOVER USE PERMITS for the following: 1) electric generating station (solar photovoltaic facility); 2) electrical substation; 3) generation intertie transmission line; 4) allow public utility structures with all accessory/ancillary structures; 5) eliminate landscaping and screening requirements; 6) eliminate trash enclosure; 7) increase the height of utility structures; 8) noise limits; and 9) allow signage.
DESIGN REVIEWS for the following: 1) electric generating station (solar photovoltaic facility); 2) electrical substation; 3) generation intertie transmission line; 4) public utility structures with all accessory/ancillary structures; 5) maintenance building and all ancillary structures and facilities; and 6) finished grade in conjunction with a proposed electric generation station, substation, and intertie transmission line on 2,400 acres in an R-U (Rural Open Land) Zone.

 

Generally located on the south side of SR 160 and south of Trout Canyon Road within the Northwest County Planning Area.  JJ/jor/syp  (For possible action)