File #: 23-400016-041823   
Status: Passed
File created: 4/6/2023 In control: Clark County Planning Commission
On agenda: 4/18/2023 Final action: 4/18/2023
Title: ET-23-400016 (UC-0550-08)-USA: USE PERMIT FOURTH EXTENSION OF TIME to commence the use of hazardous materials storage in conjunction with a water treatment facility. DESIGN REVIEW for public facility structures (water treatment facility) on 20.0 acres in a P-F (Public Facility) Zone. Generally located on the north and south sides of Cactus Avenue (alignment) and on the west side of Buffalo Drive within Enterprise. JJ/rk/syp (For possible action)
Attachments: 1. ET-23-400016_Color_Merged.pdf, 2. 05 23-400016-041823.pdf

ET-23-400016 (UC-0550-08)-USA:

 

USE PERMIT FOURTH EXTENSION OF TIME to commence the use of hazardous materials storage in conjunction with a water treatment facility.

DESIGN REVIEW for public facility structures (water treatment facility) on 20.0 acres in a P-F (Public Facility) Zone.

 

Generally located on the north and south sides of Cactus Avenue (alignment) and on the west side of Buffalo Drive within Enterprise.  JJ/rk/syp  (For possible action)