Title:
|
WS-21-0545-RAINBOW 26, LLC:
HOLDOVER WAIVERS OF DEVELOPMENT STANDARDS for the following: 1) establish an alternative parking requirement; 2) allow a modified driveway design; and 3) reduce driveway approach and departure distances from the intersection.
DESIGN REVIEWS for the following: 1) alternative parking lot landscaping; 2) a proposed shopping center; and 3) finished grade on 3.8 acres in a C-1 (Local Business) (AE-60) Zone in the CMA Design Overlay District. Generally located on the east side of Rainbow Boulevard and the north side of Oquendo Road within Spring Valley. MN/rk/jo (For possible action)
|