9/22/2021 |
Clark County Zoning Commission
| Approved
Agenda note: SUBJECT MATTER: In the matter of the aforementioned described application of County of Clark (Aviation) & Beltway Business Park Warehouse #10 Lease (Rod Martin) for a waiver of conditions (as indicated on the ATTACHED agenda item):
REPRESENTATIVE(S): Present
DISCUSSION: There being no objections, Item No. 31 was taken in conjunction with Item Nos. 32 and 33.
Following introduction of Item Nos. 31, 32 and 33, staff advised of changes to the standard development agreement.
The Board was addressed by the applicant’s representative, John Vornsand, who advised that the proposed site was for a 228,000 square foot warehouse distribution center that would be comprised of three buildings; the 37,000 square foot warehouse fronted Lindell, and two distribution buildings faced south toward Badura. The internal facing loading docks will be screened with landscaping, building projections, and stem walls; detached sidewalks and landscaping surrounded the site; with four concrete utility easements did not allow for landscaping in those locations; requested a waiver to eliminate the cross access between the distribution center and the office buildings located to the northeast; a waiver of driveway geometrics and driveway width was requested. The removed condition was from 2004 that no longer fit the application; staff approved the waiver; the new parking lot on the west of the office park had 151 parking spaces, was not visible from surrounding streets; and landscape dividers were located between every ten parking spaces.
Staff advised that revised plans illustrating five-foot pedestrian islands for the driveway geometrics must be submitted. | Pass |
Action details
|
Meeting details
|
Video/Audio
|