File #: 21-0506-110221   
Status: Passed
File created: 10/21/2021 In control: Clark County Planning Commission
On agenda: 11/2/2021 Final action: 11/2/2021
Title: WS-21-0506-NEVADA SPEEDWAY, LLC: WAIVER OF DEVELOPMENT STANDARDS for a temporary building (membrane structure). DESIGN REVIEW for a temporary building (membrane structure) in conjunction with a robotic vehicle testing facility at an existing racetrack facility on a portion of 390.3 acres in a C-2 (General Commercial) (AE-65, AE-70, and AE-75) Zone. Generally located on the northeast side of Speedway Boulevard and the south side of I-15 within Sunrise Manor. MK/nr/jo (For possible action)
Attachments: 1. WS-21-0506_Color_Merged.pdf, 2. 22 21-0506-110221.pdf

WS-21-0506-NEVADA SPEEDWAY, LLC:

 

WAIVER OF DEVELOPMENT STANDARDS for a temporary building (membrane structure).
DESIGN REVIEW for a temporary building (membrane structure) in conjunction with a robotic vehicle testing facility at an existing racetrack facility on a portion of 390.3 acres in a C-2 (General Commercial) (AE-65, AE-70, and AE-75) Zone. 

 

Generally located on the northeast side of Speedway Boulevard and the south side of I-15.  MK/nr/jo  (For possible action)