File #: 22-0672   
Status: Agenda Ready
File created: 4/28/2022 In control: Clark County Board of Commissioners
On agenda: 6/7/2022 Final action:
Title: Approve the award of Bid No. 606120-22, for Hotel Rio Drive - Flamingo Road to Dean Martin Drive to the low responsive and responsible bidder, contingent upon submission of the required bonds and insurance. Staff recommends award to Las Vegas Paving Corporation; or take other action as appropriate. (For possible action)
Attachments: 1. Staff Report, 2. B606120-22 Disclosures

CLARK COUNTY BOARD OF COMMISSIONERS

AGENDA ITEM

 

Petitioner:

Les Lee Shell, Deputy County Manager Denis Cederburg, Director of Public Works

Recommendation: 

title

Approve the award of Bid No. 606120-22, for Hotel Rio Drive - Flamingo Road to Dean Martin Drive to the low responsive and responsible bidder, contingent upon submission of the required bonds and insurance. Staff recommends award to Las Vegas Paving Corporation; or take other action as appropriate. (For possible action)

body

 

 

FISCAL IMPACT:

Fund #:

4180.001

Fund Name:

Fund Name: Master Transportation Resort Corridor

Fund Center:

1260110001

Funded PGM/Grant:

PW.S020113

Amount:

$4,045,000

Description:

Hotel Rio Drive - Flamingo Road to Dean Martin Drive

Additional Comments:

None

 

BACKGROUND: 

Bid No. 606120-22, for Hotel Rio Drive - Flamingo Road to Dean Martin Drive was advertised on March 8, 2022 and opened on April 4, 2022.  The Bid Amounts are as follows:

BID RECEIVED:   
                                                                                                                              BID AMOUNT:
Las Vegas Paving Corporation (NBE)
                                                                                    $4,045,000
                     
This Contract is for the removal and replacement of plantmix bituminous surface and UTACS (Ultrathin Asphalt Concrete Surfacings); reconstructing concrete medians and a sidewalk ramp; new curb and gutter; reconstructing sidewalk; ITS facilities; new street lights and upgrading HPS lighting to LED; striping and signing; traffic signal improvements; loop detector replacement; one drop inlet, RCP, and manhole; replacing bearing pads and resurfacing a bridge; reconstructing barrier rail; installing guardrail; resurfacing a concrete channel; concrete crack and spall repairs in the concrete channel.

The following are the pertinent provisions of the Contract:
                     The Contractor shall complete the entire work within 90 calendar days from the date specified in the                      Notice to Proceed.
                     Includes the standard termination for cause within 7 business days and termination for convenience                      language as in all public works efforts of this type.

The recommendation of award is in accordance with NRS 338.1385.5, a public body or its authorized representative shall award a contract to the lowest responsive and responsible bidder.

Las Vegas Paving Corporation currently holds a Clark County Business License.