File #: 22-0549-111522   
Status: Passed
File created: 11/3/2022 In control: Clark County Planning Commission
On agenda: 11/15/2022 Final action: 11/15/2022
Title: UC-22-0549-BELTWAY BUSINESS PARK LLC & BELTWAY BUSINESS PARK WAREHOUSE NO 8 LLC (LEASE): USE PERMITS for the following: 1) a 230kV electric substation; and 2) increased height. DESIGN REVIEWS for the following: 1) a proposed 230kV substation with associated equipment; and 2) proposed utility structures (200kV to 230kV transmission lines) on an 8.6 acre portion of 38.0 acres in an M-D (Designed Manufacturing) Zone in the CMA Design Overlay District. Generally located on the north side of Badura Avenue and the east side of Jones Boulevard within Enterprise. MN/sd/syp (For possible action)
Attachments: 1. UC-22-0549_Color_Merged.pdf, 2. 11 22-0549-111522.pdf

UC-22-0549-BELTWAY BUSINESS PARK LLC & BELTWAY BUSINESS PARK WAREHOUSE NO 8 LLC (LEASE):

 

USE PERMITS for the following: 1) a 230kV electric substation; and 2) increased height. DESIGN REVIEWS for the following: 1) a proposed 230kV substation with associated equipment; and 2) proposed utility structures (200kV to 230kV transmission lines) on an 8.6 acre portion of 38.0 acres in an M-D (Designed Manufacturing) Zone in the CMA Design Overlay District.

 

Generally located on the north side of Badura Avenue and the east side of Jones Boulevard within Enterprise.  MN/sd/syp  (For possible action)