Title:
|
UC-24-0716-REV RENEWABLES DEVELOPMENT HOLDINGS, LLC:
USE PERMIT for public utility structures (BESS facility, electric substation, and overhead transmission lines) and associated equipment.
WAIVERS OF DEVELOPMENT STANDARDS for the following: 1) increase structure height; 2) eliminate street landscaping; 3) reduce security fence height; 4) reduce gate setback; and 5) waive full off-site improvements.
DESIGN REVIEW for public utility structures and associated structures and equipment on 8.91 acres in an IP (Industrial Park) Zone. Generally located on the south side of Spring Canyon Road, 825 feet west of the US 95 right-of-way within the South County Planning Area. JG/hw/kh (For possible action)
|