Skip to main content
File #: 25-2412   
Status: Passed
File created: 5/14/2025 In control: Clark County Board of Commissioners
On agenda: 6/3/2025 Final action: 6/3/2025
Title: Approve the award of Bid No. 607506-25, for All Ballfield Shade Structure to the low responsive and responsible bidder, contingent upon submission of the required bonds and insurance. Staff recommends award to Maile Inc. dba Maile Concrete; or take other action as appropriate. (For possible action)
Attachments: 1. Staff Report, 2. B607506-25 Disclosure

CLARK COUNTY BOARD OF COMMISSIONERS

AGENDA ITEM

 

Petitioner:

Jessica Colvin, Chief Financial Officer Shauna Bradley, Director of Real Property Management

Recommendation: 

title

Approve the award of Bid No. 607506-25, for All Ballfield Shade Structure to the low responsive and responsible bidder, contingent upon submission of the required bonds and insurance. Staff recommends award to Maile Inc. dba Maile Concrete; or take other action as appropriate. (For possible action)

body

 

 

FISCAL IMPACT:

Fund #:

4370.000

Fund Name:

County Capital Projects

Fund Center:

1120820001

Funded PGM/Grant:

N/A

Amount:

$1,856,800

Description:

All Ballfield Shade Structure

Additional Comments:

None

 

BACKGROUND: 

Bid No. 607506-25, for All Ballfield Shade Structure was advertised on March 17, 2025, and opened on April 16, 2025. The Bid amounts are as follows:

BIDS RECEIVED:                                    
                                          BASE BID PLUS ADDITIVE
                                                                                                                                                   ALTERNATE NO. 1, 2 & 3                     
Maile Inc. dba Maile Concrete (NBE)
                                                        $1,856,800
SHF International LLC (NBE)                                           $2,115,860
Monument Construction (NBE)
                                                                             $2,231,700
JNJ Engineering Construction Inc. (NBE)
                                   $3,489,971

This Contract is for the construction of shade structures in all ballfields. Scope one is for Sunset Park Ballfields, scope two is for Hollywood Reginal Park Ballfields, and scope three is for Red Ridge Park Ballfields.

Additive Alternate No. 1 is for Ballfields 3-6: Four (4) new 23’6” x 29” multi-panel fabric shade structure over new concrete pad for bleachers. Fabric color dark blue. Powder coat steel shade structure ivory. The price for installations shall include purchasing all required permitting, all associated appurtenances and accessories as required for a full and compete installation of the items and materials.

Additive Alternate No. 2 is for Ballfields 3-6: Paint eight (8) existing dugout roof dark navy blue.

Additive Alternate No. 3 is for Ballfields 3-6: One (1) new 50’ x 50’ pavilion structure with multi-panel shade fabric over new concrete pad. Fabric color dark blue and ivory. Powder coat steel shade structure ivory. The price for installations shall include purchasing all required permitting, all associated appurtenances and accessories as required for a full and compete installation of the items and materials.

The following are the pertinent provisions of the Contract:

                     The Contractor shall complete the entire work within 210 calendar days from the date specified in the                      Notice to Proceed.
                     Includes the standard termination for cause within 7 business days and termination for convenience                      language as in all public works efforts of this type.

The recommendation of award is in accordance with NRS 338.1385.5, a public body or its authorized representative shall award a contract to the lowest responsive and responsible bidder.

Maile Inc. dba Maile Concrete currently holds a Clark County Business License.